Align – South Portal 2020

  • Completing the first permanent structure on HS2
  • Working in a narrow area and adapting methodology to achieve milestones
  • Managing 10,000 cube of concrete and 4000 tons of steel
  • Managing the supply chain to release areas early to allow for the complex Tunnel Boring Machine to be manufactured.

Client

HS2


Value

£25m


Duration

40 weeks

Align – South Portal Enabling works (2020 – 2021)

  • Infrastructure works to launch TBM, 2 precast factory’s, Gantry rails, 4 batching plants & filter press
  • Managing 18,000 cube of concrete and 7000 tons of steel
  • Achieving programme successfully by managing sub-contractors and workforce to meet key milestones

Client

HS2


Value

£100m


Duration

70 weeks

CASE STUDIES

A2-westbound slip road – 2022

  • A2 extension to slip road and road widening      
  • Re-configuration Wincheap traffic signal
  • Installing Sheet piles and retaining walls

Client

Breheny


Value

£9m


Duration

42 weeks

CASE STUDIES

London Gateway – DP World 2016

  • Working within the UK’s largest operational container port      
  • Constructing 68 in-situ RC manholes
  • HV & LV cable pits
  • Constructing 840 Reefer container plinths
  • 6 Substation bases
  • Main access bridge into the port built under 12 weeks

Client

Volker Fitzpatrick


Value

£80m


Duration

66 weeks

Tilbury Dock Development – Amazon 2017

  • Warehouse building. 22 million square foot, 371m long by 137m wide and 21m high.
  • A two story office block
  •  61 loading docks     
  • Managing installation of utilities

Client

McLaren


Value

£100m


Duration

52 weeks

St James Development – 2018

  • Earthworks and groundworks for an 8 Acre Leisure centre
  • Reinforced concrete frame for 25 retail units
  • 6 screen cinema – CineWorld
  • Travel lodge hotel with 102 rooms
  • 278 works from the A2, including 450 space car park

Client

Bond City


Value

£20m


Duration

40 weeks

DWDR – Dover Docks 2019

  • Working to deliver paving, utilities and Infrastructure works
  • The paving operation which consisted of importing aggregate from the English channel and managing its own batcher plant onsite
  • Works included all re-connection roads as well as lighting and power

Client

Port of Dover


Value

£21m


Duration

52 weeks

Tilehouse Overbridge and Culvert – South Portal 2020

  • Completing the first permanent bridge on HS2
  • 22m span bridge and 30m reinforced concrete structure
  • Bespoke Reckli finish to the concrete walls

Client

Volker Fitzpatrick


Value

£5m


Duration

25 weeks

Houlihans Housing

  • 50+ luxury house in Kent
  • Attention pond
  • 2 km of 278 works with drainage

Client

Dandara


Value

£4m


Duration

30 weeks

Harvil Bridge – 2021

  • 18m span Bridge over a live network rail line
  • 9m high walls with Reckli finish

Client

Skanska Costain and Strabag


Value

£12m


Duration

45 weeks

West Ruislip Portal – 2021

  • Launch 2 TBM into London from West Ruislip
  • Enabling works conveyor system, Gantry Rails, Soil Treatment area, Water treatment Areas, Grout plant, Power Supply & attenuation drainage system.

Client

Skanska Costain and Strabag


Value

£20m


Duration

55 weeks

read what people think of HGE Field Engineering

5.0
Based on 9 reviews
powered by Google
Eleni Gkolfinou
10:33 14 Jun 22
I have known and worked with John Field on and off for the last seven years. John is always so passionate about ensuring his customers receive the best experience! I have enjoyed working collaboratively with John as he is always so authentic and enthusiastic about the work he does. His encouragement helps give people confidence that they can continue to grow and take on new challenges with the company.
Nigel Sullivan
20:50 12 May 22
A great company to do business with. Helpful, knowledgeable and respectful. Highly recommended!
Robin Farley-Boad
19:14 11 May 22
Just outstanding. If only I could give 6 stars.
Donal McCarthy
17:47 11 May 22
Great experience and service
daniel woodward
17:02 11 May 22
Great company! Has a very good outfit with all the latest technologies and capable of producing high quality engineering
Matt Reeves
16:43 11 May 22
Prash
16:39 11 May 22
Professionals with best quality management and delivery the projects on time. Love to working with you again.
ss ss
16:33 11 May 22
More reviews
js_loader